FABRICATION & CONSTRUCTION

VIWAPA 60″ Header 

Location: ST. CROIX USVI
Client: VIWAPA
Completion Date: 2015
Project Description:

Fabrication and installation of 5/8″ x 60″ x 20′-0″ water header with 60″, 30″ (2ea.) and 24″ (3ea) nozzles. All work done using the latest welding technology available. Work done at our shop and installation done in Virgin Island.

 

HEADER

PUMA Energy 

Location: Bayamón, PR
Client: PUMA Energy
Completion Date: 2015
Project Description:

The most challenging project ever done in Puerto Rico rehabilitating 27 propane bullets, scope of work includes nozzles repairs, nozzles replacement, pitting repairs, manways replacement, fire protection systems, access platforms fabrication and erection, site grading, concrete bases rehabilitation, surface preparation and painting.

 

28

AEE Palo Seco Plant

Location: San Juan, PR
Client: AEE
Completion Date: 2010
Project Description:

Fabrication and installation of pipe support, foam chambers, pipe surface preparation and valves installation of all the main lines and branches for the Reserve sytem, Services System, Distillate System, Hose Line Systems, Pump Station Lines, LDO Pump Station, Foam House.

 

FIRE

Aguirre Air Inlet Duct System

Location: Aguirre, PR
Client: AEE
Completion Date: 2009
Project Description:

Fabrication of new air inlet duct system for a GE MS7001 Gas Turbine in AEE Aguirre Plant that includes two main duct sections with silencers and transitions ducts, surface preparation and painting.

 

AIR

PUMA Tank 502

Location: Bayamón, PR
Client: PUMA Energy
Completion Date: 2014
Project Description:

Major overhaul of 100′-0″ diameter by 40′-0″ high API tank. Scope includes sand replacement, liner installation, leak detection system fabrication and installation, annular ring fabrication and installation, bottom erection, new roof structure fabrication and erection, new roof deck, fabrication and erection of fire protection system, fabrication and erection of cooling rings, fabrication and installation of new nozzles, installation of insert plates, inside surface preparation and painting, outside surface preparation and painting.

 

 TANK

AEE Aguirre Condenser Water Boxes

Location: Aguirre, PR
Client: AEE
Completion Date: 2010
Project Description:

Replacement of condenser water boxes, in this project we faced the challenge of wrong weight given by owner, boxes were indicated with weight of 29,000 pounds and the real weight was 58,000.00 pounds, Irontech made a strategy change and correct in place all the custom made structure to lift and move these huge boxes with limitation everywhere, most part of these limitations were lines in operation. The result a work done before any other customer during this shutdown, another proof that in our case the harder the challenge the better the results.

 

WATER