POWER GENERATION

Vieques Emergency Power Plant

Location: Vieques, PR
Client: PREPA
Completion Date: 2004
Project Description:

Supply, design, installation supervision and commissioning of a 6 MW plant in Vieques Island, Puerto Rico, at a cost of US $ 9,800,000.00 million. Using Wartsila generation equipment and technology, RGE completed this project which consists of two 3 MW units, including its 4.160 kV/38kV and underground transmission line.

 

5

Pimentel I & II

Location: Dominican Republic
Capacity: 60 MV
Fuel: DUAL (LNG y HFO)
Contact: Ing. Vinicio Quevedo

Design, supply, installation and commissioning of a 60 MW generating station in the Dominican Republic valued at $65 million. Using Wartsila generation equipment and technology, RGE completed the design, supervision, supply, inspection, construction management, commissioning and operation of the project. The facility includes four 9MW engines and four 7 MW engines.

 

2

Pimentel III

Location: Dominican Republic
Capacity: 51 MV
Fuek: Dual (HFO y LNG)
Contact: Ing. Vinicio Quevedo

The second-generation plant of 51 MW of installed capacity was developed in Pimentel, Dominican Republic at a cost of $60 Million. Using Wartsila generation equipment and technology, RGE completed the supply, design, supervision, inspection, construction management, commissioning and operation and maintenance of the project. This project consists of 3 17 MW generators for a total of 51 MW.

 

4

Haina Turbo Gas

Location: Dominican Republic
Capacity: Gas Turbine 100 MV
Fuek: Diesel
Contact: Mrs. Olivia de la Cruz

Design and installation of Siemens Westinghouse model gas turbine with a project cost of US $ 7,000,000.00. Using technology and Siemens Westinghouse generation equipment, RGE provided complete supervision, inspection, installation, construction management and commissioning for the project.

 

30

Sanchez Province

Location: Dominican Republic
Capacity: 55 MV
Fuek: Diesel
Contact: Mr. Pedro Andujar

Generating station in Sanchez Province, Dominican Republic. The facility consists of 55 MW of reciprocating engine installed capacity, developed at a cost of $ 30 million. Using EMD generation equipment and technology, RGE completed the design, supervision, inspection, construction management, operation and maintenance for the project, including the commissioning of twenty-five engines from 2 to 2.5 MW each.

 

1

Energy Distribution in Dominican Republic

Location: Dominican Republic
Capacity: 60 MV
Fuek: Diesel
Contact: Ing. Manuel Sebastian

The second-generation plant of 51 MW of installed capacity was developed in Pimentel, Dominican Republic at a cost of $60 Million. Using Wartsila generation equipment and technology, RGE completed the supply, design, supervision, inspection, construction management, commissioning and operation and maintenance of the project. This project consists of 3 17 MW generators for a total of 51 MW.

 

31

Los Origenes

Location: Dominican Republic
Capacity: 58 MV
Fuek: Dual (HFO y LNG)
Contact: Mr. Vinicio Quevedo

A 58 MW plant in Origenes, Dominican Republic, developed at a cost of $15 Million. Using Wartsila generation equipment and technologyRGE completed supervision, inspection and construction management for the project, including the commissioning of two 17MW engines and three 8MW engines.

 

32